• A RAS is very dependent on sufficient and stable access to electricity.
  • The access and capacity of the nearest power grid varies according to location. If not sufficient, it will be wise to check with local municipality if they will cover the expansion. If not, the cost must be covered by project.
  • Local authorities are often helpful in supplying access to a sufficient and reliable grid. The reason is often the ripple effect that a power grid expansion provides. Examples of these could be improved infrastructure or increased business activity in the area.